Plans & Permits: Wondering what the sign permit process is all about?
Oct 11, 2023 by Mallory Lynn
Learn about the Signage Permitting Process with this FAQ guide.
Q: Is a permit required for an exterior business sign in Colorado?
A: Yes, a sign permit is required. The permit process does ensure your sign legally meets zoning and building ordinances as well as safety standards. You can be fined if you do not have a permit.
Q: How long does the sign permit process take?
A: Most cities, counties and jurisdictions typically take about two to four weeks. In some cities such as Denver, the zoning department needs to review the application. You will want the permit approved before starting fabrication of the sign.
Q: I need a business sign earlier. What do I do?
A: We can help you with temporary signage such as banners, window posters, or sidewalk signs (such as A-Frames and Sandwich boards) so customers can locate your business. Because changes in sign size and location may occur (and sometimes do) you will want the permit to be approved before we begin fabrication of the sign. In some cases, permits will be required for temporary signs and usually, there is a specific time limit for the temporary signage. Often the time limit is 90 days to 6 months for these types of signs.
Q: What’s a typical process for a sign permit to be approved?
A: Unfortunately, the permit process varies widely among towns. Your neighbor across the street can have different regulations due to zoning. Every city and town has different requirements and processes because it’s a local jurisdiction. Regulations can, also, change as cities and counties update their permit requirements.
Processes can be cumbersome and lengthy. For instance, some cities require a zoning application to be approved before a building and electrical application can be submitted. Some will require a person to hand-deliver the paperwork and wait for a reference number.
Q: When do you start the permit process?
A: We start once you approve the sign design, authorize the quote, and provide a half down payment on the project.
Q: What’s needed for the permit process and what information do you need from me?
A: When you approve the sign design, we will contact you to request the documents needed. Permits require all or some of these documents:
- The property owner’s signed approval
- A licensed surveyor’s site plan. The document is usually needed for freestanding signs. You can retrieve a copy from the property owner.
- Stamped plans by a licensed engineer. This plan is required by many towns for certain types of signs that are over 6 feet tall.
- A special committee review application (such as planning board or special improvement district)
- A zoning application form
- A building and electrical application form. If the sign is illuminated, electrical approval is needed.
- Your sign’s drawings and schematics provided by Signarama

Signarama Brighton, CO
1289 S 4th Ave Ste 200
BrightonColorado80601
Sales by Appointment Only. Pick-up/Deliveries Monday-Friday 8:30am-5pm.
Opening Hours:
contact
Signarama Brighton, CO
CLIENTS WE HAVE WORKED WITH: